STEP handover: visible tolerances may not be machine-readable

Agree whether the receiving workflow needs graphic annotations, semantic PMI or both before accepting a spare-part model exchange.

Two translucent panels showing a block outline and linked circles, with a stepped metal block in front.

A spare-part model can display tolerance annotations clearly while leaving the receiving automation without usable requirement data. If the agreed handover includes downstream inspection or manufacturing data, the buyer needs more than a screenshot showing that the annotations exist visually.

Start with the receiving task. A human review copy and a machine-interpretable deliverable can be different requirements. Neither should be assumed from the file extension alone.

Ask what kind of PMI was transferred

NIST distinguishes semantic PMI, which is computer-interpretable, from graphic PMI, which preserves visual appearance without representation information. Its STEP tools report these categories separately. NIST STEP File Analyzer description

Ask the sender to identify the content delivered and the receiver to identify the content its agreed workflow requires. Do not infer semantic transfer because the STEP file opens or the screen resembles the source drawing. Conversely, do not reject a legitimate visual-review deliverable for lacking a machine-readable requirement that was never in scope.

Agree the handover purpose before judging the file

Identify the released part definition, the exact file being exchanged and its intended recipient. Record whether the deliverable is for visual review, geometry transfer, an agreed semantic-PMI workflow or a combination. Keep any separate drawing or requirement document and its governing relationship explicit.

Request attributable evidence from the sender and receiver for the needed content. A useful response identifies the examined file and relevant report or review result. A screenshot can support visual inspection but should not be described as proof that a downstream system interpreted the requirement correctly.

If a data category is missing, ask whether a corrected export, another agreed deliverable or a revised scope is proposed. That is a decision about the exchange contract. It is not permission for the coordinator to recreate tolerance semantics from a picture or decide which drawing symbols can be discarded.

A fictional automated-inspection handover

Imagine an order whose agreed deliverable includes semantic PMI for a specified inspection workflow. The supplier sends a STEP model and a screenshot with visible dimensions, then calls the data transfer complete. The recipient reports that the required semantic information has not been demonstrated for that file.

Retain the screenshot under its visual role and request evidence addressing the agreed semantic requirement. If the supplier can provide only graphic PMI, record the gap and obtain an authorized decision on the deliverable. Do not silently downgrade the requirement because the image looks correct. This fictional scenario does not assert a failure in any particular software.

Keep an exchange-purpose record

FieldEvidence or decision
Released definitionApplicable part and governing requirement reference
Exchanged fileExact file identity and attributable sender
Receiving purposeHuman review, geometry, semantic use or agreed combination
PMI evidenceSeparate graphic and semantic coverage for that file
Remaining scopeMissing category, proposed remedy and decision owner

Close the question by naming the content and purpose actually established. Correct PMI transfer still does not approve the tolerances, prove a manufactured part conforms or authorize machining. The technical owner retains the product decision; the exchange evidence establishes what information the recipient can review or use within its verified workflow.

Send the bounded handover question

Use the machined-parts category and Spareparts sourcing request to describe the item and unresolved purchasing question. Independent aftermarket or unbranded buying coordination and supplier negotiation do not establish manufacturer affiliation, original-equipment supply, specialist technical capability or engineering approval.

The initial form accepts a supported marketplace HTTPS link, an 8–1200-character description or screenshots. It accepts up to five PNG, JPEG, WebP or GIF images, no more than 10 MiB each and 20 MiB combined. PDF, CAD and ZIP files require a separately agreed authorized exchange; the image field is not a technical-file portal.

Frequently asked questions

Does a visible tolerance prove semantic PMI is present?

No. Graphic presentation and computer-interpretable representation are different categories. Request evidence for the content the receiving workflow requires.

Is graphic PMI always an unacceptable delivery?

No. Its suitability depends on the agreed purpose. A visual-review deliverable should not be judged against an unagreed automation requirement.

Can a screenshot replace the exchanged file’s content evidence?

It can support a visual review but does not establish semantic interpretation. Keep the exact file and applicable sender/receiver evidence together.

Does successful semantic transfer approve the product design?

No. It addresses information transfer. The governing requirements, technical approval and manufacturing acceptance remain separate decisions.