CNC machining from China: prepare a quotable part

Last updated

Published by 1688 Spare Parts · Review method

Key takeaways

  • Send controlled geometry, material, tolerances, processing and inspection requirements for the actual part.
  • Approve substitutions explicitly and confirm testing methods and batch-linked documents.
  • Obtain a current staged schedule and quantity quote; no universal short lead time or near-free extra spares applies.

For a made-to-drawing spare, a useful quotation begins with a controlled definition of the part and its acceptance requirements. Supplier capability and commercial terms vary; a location or low price does not guarantee speed or quality.

This guide covers buying machined components. It does not cover purchasing a CNC machine.

Turn this guide into a buying request

Keep this page as context. Add what you know; review everything before sending. No purchase is made at this step.

Continue to request →
The RFQ package
  1. Readable dimensioned drawing with part ID, revision, units and approval status.

  2. A suitable 3D model where available, with the drawing/model precedence stated. Confirm accepted file formats with the shop.

  3. Material grade and condition, approved substitutions, heat treatment, hardness and coating.

  4. Functional datums, dimensions and tolerances, threads, finish and edge requirements.

In this guide

The RFQ package

  • Readable dimensioned drawing with part ID, revision, units and approval status.
  • A suitable 3D model where available, with the drawing/model precedence stated. Confirm accepted file formats with the shop.
  • Material grade and condition, approved substitutions, heat treatment, hardness and coating.
  • Functional datums, dimensions and tolerances, threads, finish and edge requirements.
  • Quantity and credible reorder expectation; distinguish a first article from released production.
  • Inspection/report requirements, intended use, failure consequence, destination and required date.

Avoid both missing requirements and arbitrary precision

A plain geometry model may omit manufacturing intent; some model-based definitions do carry it, so agree the authoritative specification. There is no universal count of critical dimensions. Mark every feature required by the responsible design and use appropriate general requirements elsewhere.

A real published tolerance comparison, not a universal shop capability

On 2 October 2026 we reviewed Protolabs’ published machining-tolerance guidance. It distinguishes an automated-factory standard of ±0.005 in (about ±0.13 mm), a precision option of ±0.002 in (about ±0.051 mm), and tighter specified reamed-hole capability. It also distinguishes automated-factory terms from its semi-automated/network standards.

This is one provider’s stated service scope, not a measured result or a capability claim for our suppliers. It shows why “standard CNC tolerance” cannot settle a quote. Require each candidate to accept the actual drawing feature by feature, including which process and inspection are priced. A generic web tolerance must never overwrite your approved drawing.

Protolabs: different machining services have different published tolerance scopes ↗

A compact hypothetical RFQ that can be checked

Example only, not a recommended component design: request 20 non-safety-critical fixture spacers, part FS-01 revision B, millimetres, drawing authoritative over a plain geometry STEP file. A designer-approved bore is 10.00 to 10.02 mm after finishing; length is 40.00 ±0.10 mm. The drawing must also define all other functional geometry, material/condition, edges, finish and acceptance requirements.

Ask each shop to state whether the bore will be bored, reamed or otherwise finished, which supplied features it will measure and how it will prevent mixing revisions. Do not infer that a machine with 0.01 mm display resolution can make or inspect a 0.02 mm-wide tolerance. Require separate prices for setup, first article, material evidence, treatment and the released batch.

Read a first-article result using the agreed decision rule

Hypothetical inspection exercise: a different feature has a permitted range of 19.980–20.020 mm. Suppose the agreed conservative rule requires the full reported measurement interval to lie inside that range. A result of 20.006 mm with stated expanded uncertainty ±0.004 mm gives 20.002–20.010 mm and passes this feature. A result of 20.019 ±0.005 mm gives 20.014–20.024 mm and is held under that rule, even though the central reading is inside.

The rule, uncertainty basis and coverage must be agreed with competent metrology staff before inspection. This is an arithmetic illustration, not a real first-article report or a universally mandated decision rule. It cannot release unmeasured features, material or function. NIST explicitly separates measurement traceability from fitness for the intended measurement purpose.

NIST traceability policy and FAQ 5.1.4: uncertainty and fitness for purpose ↗

Verify material without assuming equivalence

State the exact standard and grade, condition and evidence required. A suggested alternative needs engineering approval based on the required properties. Chemical identification alone does not prove heat treatment or mechanical performance. Thermo Fisher’s explanation of PMI methods illustrates why the testing method matters, including XRF’s carbon limitation.

Thermo Fisher Scientific: limitations of XRF, LIBS and OES material identification ↗

Specify the delivered surface condition

  • As-machined finish and acceptable tool marks, with numerical requirements where function needs them.
  • Deburring, edge breaks and cleanliness requirements.
  • Anodising, plating, passivation or other treatment, with dimensions assessed at the defined stage.
  • Cosmetic requirements and sample approval where appearance matters.
  • Masking and protection of fits, threads, electrical contact or sealing surfaces.

Compare the quote as a process

  • Design clarification and programming/setup.
  • Material purchase and unit machining.
  • Special processing, subcontract work and certificates.
  • First article, agreed tests and production inspection.
  • Packaging, freight, import costs and installation where relevant.
  • Rework, repeat setup and revision charges, plus the validity of every quantity price.

Use technical gates for schedule and release

Ask for material availability, first-article readiness, approval allowance, production capacity, inspection and dispatch milestones. A promise of a few machining days does not answer when an accepted component can be installed. Pause for unresolved design or inspection questions rather than assuming low quantity makes them unimportant.

Resolve three quotation exceptions before the first article

  • “Material equivalent”: require the proposed standard, grade, condition and evidence, then engineering approval. A commercial substitution is not automatically a technical equivalent.
  • “Tolerance after machining”: confirm whether coating or heat treatment follows, which dimensions apply in delivered condition and whether reinspection is included.
  • “QC included”: name the report, feature IDs, actual values, method, uncertainty where decision-relevant, sampling plan and material/lot connection. A green PASS stamp alone cannot resolve a disputed bore.

Download the RFQ and release worksheet

Carry the approved drawing revision through quotation, first article, production and receiving. The worksheet includes a blank deviation log and the hypothetical measurement-decision exercise. Request a new acceptance review when a material, special-process provider, drawing or critical manufacturing method changes.

Download: machined-part RFQ, deviations and engineering-release worksheet ↗

Questions & answers

Common questions

How fast can a simple part be made?
Request a current scoped schedule. Material, capacity, treatment, first article and transport can dominate even a simple shape; there is no universal 5–10-day promise.
At what quantity does setup stop mattering?
It depends on the actual setup and unit costs. Ask for the quantities you may consume; there is no universal twenty-piece threshold.
Will I receive a material certificate?
Specify the required document, issuer and batch traceability before ordering, with its cost and timing. Availability should be confirmed rather than assumed.