SPARE-PART INVESTIGATION, RFQ AND ENGINEERING RELEASE Version 1.0 | Editorial review 2026-10-02 Complete with the responsible engineer and appropriate metrology/materials staff. Examples are fictional exercises, not designs, inspection results or approvals. 1. IDENTIFY THE FAILURE AND BOUND THE TASK Machine/model/revision: _____________________ Asset ID: _______________________ Part/sample ID and position: __________________________________________________ Fault, wear pattern and failed function: _______________________________________ Loads/speed/temperature/fluids/environment: ____________________________________ Consequences of failure: ______________________________________________________ Safe isolation/installation responsibility: ___________________________________ Required ready-to-install date: _______________________________________________ Drawings/manuals and permission to use/share them: _____________________________ Existing modifications/repairs: _______________________________________________ 2. COMPARE ROUTES, NOT JUST UNIT PRICES Route: authorised replacement / approved standard component / repair / remake to existing drawing / engineering reconstruction Supplier/contact: _____________________________________________________________ Exact scope and technical evidence: ___________________________________________ Unresolved interface or performance question: _________________________________ Engineering/design, material and first-article cost: ___________________________ Production, inspection, packing, freight, import, installation cost: ___________ Earliest supported ACCEPTED delivery date and dependencies: ____________________ Support/return limitations and stop price at current stage: ____________________ Decision owner and route status: ______________________________________________ Repeat this section for each feasible route. Do not treat unapproved units as usable inventory or a catalog envelope match as a completed technical review. 3. AS-FOUND OBSERVATIONS (DO NOT PRESENT THESE AS DESIGN INTENT) Feature/sample ID: ____________________________________________________________ Condition: unworn / worn / cracked / deformed / repaired / unknown Measurement, units, locations and orientation: ________________________________ Method/instrument/calibration reference: ______________________________________ Uncertainty/known method limits: ______________________________________________ Mating-part information and its source: _______________________________________ Photo/scan/file reference: _____________________________________________________ 4. ASSUMPTIONS REGISTER: REPEAT FOR EACH UNRESOLVED REQUIREMENT Feature/material/process question: ____________________________________________ Measured condition: ___________________________________________________________ Proposed original or revised requirement: _____________________________________ Evidence supporting that proposal: ____________________________________________ What additional evidence/test is needed: ______________________________________ Engineering approver: ______________ Decision/date: ___________________________ Drawing revision resulting from the decision: _________________________________ Do not round a worn dimension into a nominal size without design approval. 5. CONTROLLED MANUFACTURING PACKAGE Part/drawing ID and released revision: ________________________________________ Units and model/drawing precedence: ___________________________________________ Material STANDARD/GRADE/PRODUCT FORM/CONDITION: ________________________________ Material evidence and heat/lot linkage: ________________________________________ Chemistry test method and required elements: __________________________________ Hardness/heat treatment/coating evidence (separate from chemistry): _____________ Datums, critical dimensions/geometric controls and limits: _____________________ Surface finish, burrs/edges, cleanliness: ______________________________________ Dimensions apply before / after which treatment: ______________________________ Approved process and subcontracting/change-notification terms: _________________ Quantity: first article ____ ; released production ____ ; reorder estimate ____ Editable deliverables, ownership and reuse rights: _____________________________ 6. QUOTATION EXCEPTIONS / DEVIATIONS Supplier: __________________ Proposed change: _________________________________ Reason and effect on cost/schedule/acceptance: _________________________________ Technical reviewer decision: _________________________________________________ Updated drawing/specification identifier: _____________________________________ No change accepted by silence. "Equivalent", "standard tolerance" and "QC included" must be expanded into checkable requirements before release. 7. FIRST-ARTICLE REPORT ROW (REPEAT BY FEATURE) Part/sample and material lot: ______________ Drawing revision: ________________ Feature ID and datum/measurement condition: ___________________________________ Nominal and lower/upper limits with units: _____________________________________ Actual result (not only PASS): ________________________________________________ Method/instrument and calibration reference: __________________________________ Decision-relevant uncertainty/coverage: ________________________________________ Pre-agreed acceptance decision rule: ___________________________________________ Result: pass / reject / hold ; reviewer and date: ______________________________ Nonconformity, correction and reinspection record: _____________________________ Separate material/process/function evidence still open: _______________________ 8. RELEASE AND NEXT ORDER Investigation / drawing / first article / production / installation stage: _____ Required inputs satisfied: ____________________________________________________ Unresolved risks or assumptions: ______________________________________________ Release owner/date: ___________________________________________________________ Batch inspection and traceability plan: _______________________________________ Change triggers needing requalification: ______________________________________ Future catalog/status recheck date: ___________________________________________ FICTIONAL MEASUREMENT EXERCISE Feature acceptance range: 19.980 to 20.020 mm. Assumed conservative rule: the entire stated expanded-uncertainty interval must fall inside that range. A competent reviewer must agree the real rule beforehand. A: 20.006 +/-0.004 -> interval 20.002 to 20.010 -> feature passes this rule. B: 20.019 +/-0.005 -> interval 20.014 to 20.024 -> HOLD under this rule. This exercise is not a real report or a universal rule. It does not release unmeasured features, material, heat treatment or functional performance. FICTIONAL RECONSTRUCTION EXERCISE Worn spacer bore: 10.18-10.24 mm; mating pin as found: 9.99 mm. Correct record: original bore fit/tolerance unknown. Obtain the mating design and other evidence, then ask the engineering owner to approve a requirement. Incorrect shortcut: invent a 10.00 mm nominal because it seems convenient.