LANDED COST FOR SPARE PARTS

Price the part,
and the wait.

Estimate goods and freight, then compare the cost of waiting with feasible delivery options. A low freight estimate does not establish that the replacement meets its technical requirements.

Need help buying from 1688? Send a sourcing request →

Your purchase

Start with an example, or enter your own product.

Try one

Material, size and packaging change the answer more than anything else here.

YOUR ESTIMATE

Goods + freight, explained

Your shipping options appear here

Describe the product and choose a destination. We’ll show estimated parcel weights, available routes and a delivered subtotal.

  • Real freight engine pricing
  • Estimated package dimensions
  • Final quote after supplier and warehouse checks

How the landed cost of spare parts is worked out

Why air freight is defensible here

The acceptable recovery cost depends on the part, validated replacement options and the cost of downtime supplied by your business. Compare actual and dimensional billing, transport minimums and last-mile requirements rather than assuming all industrial parts are dense or all urgent orders should fly.

Where the time goes

  • Quotation: confirm when the supplier can complete the feasibility review after receiving the required drawing and application information.
  • First article: obtain a dated estimate covering materials, tooling, manufacture and inspection; approval and rework can extend it.
  • Production: agree the capacity reservation, release gate and completion milestone for the approved quantity.
  • Delivery: request current carrier milestones, booking cutoff, customs scope and final delivery arrangements for the packed goods.

What drives the unit price

Separate setup, programming, fixturing, material, cycle time, inspection and packing. Their shares vary with the part, process and quantity; additional fixtures or inspections may change the setup between quantity tiers.

For moulded or cast parts, obtain the actual tooling cost, ownership terms, minimum run and inspection requirements. Compare alternative processes only after confirming that they meet the functional specification.

Common questions

Why is one piece so expensive?
Programming, fixtures, material purchase and first-article work may be spread over few accepted parts. Ask for itemised quantity breaks; do not assume setup stays identical as the batch or inspection plan changes.
Is it cheaper to order a life’s worth?
Compare the quoted batch saving with demonstrated demand, storage, corrosion, shelf life, possible design changes and the remaining equipment plan. Future consumption is an input to establish, not a guaranteed annual rate.
Does the calculator read my drawing or listing?
No. The estimate is built from the description, quantity and price you enter. The goods price for a part made to a drawing comes from a shop’s quote.